NEOXIS AD - GPU Compute Project
Early-stage GPU compute venture for AI - Aura Digital is a 5% co-founder. The first server (8× NVIDIA RTX PRO 6000 Blackwell, 2× EPYC 9754) is delivered and installed on colocation in a data center (July 2026); no own data center yet. Website: neoxis.ai (React + Tailwind).
About the Project
NEOXIS AD is an early-stage GPU compute venture for AI and machine-learning workloads, in which Aura Digital participates as a 5% co-founder. The joint-stock company is established and the public website neoxis.ai is live (React + Tailwind, built by Aura Digital). The first GPU server was delivered in July 2026 and is installed on colocation in a third-party data center - NEOXIS does not operate its own data center yet.
Current status
- NEOXIS AD established; Aura Digital is a 5% co-founder
- First server delivered and racked on colocation, July 2026 (no own data center yet)
- Delivery, unboxing and rack installation handled by Aura Digital
- neoxis.ai website live (React + Tailwind)
The first server - delivered and installed (July 2026)
- 8× NVIDIA RTX PRO 6000 Blackwell Server Edition (Passive) - 96GB GDDR7 each, 768GB VRAM total
- 2× AMD EPYC 9754 - 128 cores, 2.25 GHz, 256MB L3, Socket SP5
- 24× Micron 64GB DDR5-4800 RDIMM ECC - 1.5TB RAM
- 2× Samsung 990 PRO 4TB M.2 NVMe (PCIe 4.0)
- 10GbE network card - 2× 10GBase-T ports (PCIe 3.0 x16)
The machine is a 4U dual-socket platform (the same one behind our AURA 4U-G8E2 configurator), assembled to order, delivered on a pallet and racked by Aura Digital in the colocation data center.
The vision
- GPU compute for AI training and inference for clients in Bulgaria and the region
- Capacity offered through GPU marketplaces (Vast.ai / RunPod) and directly
- Grow from colocated servers toward dedicated capacity over time
What Makes It Special
The venture targets a real market gap - Bulgaria has little specialized GPU capacity for AI. Aura Digital's role as co-founder is a natural extension of our hands-on experience building GPU servers (see the 8x Vast.ai servers project) and positions the company in the growing AI-infrastructure market.
Status: First server live on colocation since July 2026; capacity ramp-up ahead.
Have a similar project in mind?
Tell us - we'll scope it and return a quote within 2 business days.